UK House Builders
         

COMPLETED PROJECTS

 

Rear extension to a period property

We have recently completed a rear extention to a period property in Woking, including kitchen and dining area, roof terrace and lantern roof lights. We are now in the process of applying the finishing touches to a superb double garage with pitched roof, incorporating Velux windows to provide a storage/ work area in roof space. We have managed to achieve the desired affect of blending in the extension and garage by combining reclaimed materials with new.

 

House Builder Brief: Internal Re-configuration and Refurbishment

A build with a tiled and pitched roof, an extension including a vaulted ceiling, velux windows, and French doors to garden. An internal re-configuration-refurbishment, with unusual structural steel supporting beams. We took out the dividing walls to form a lounge/ kitchen/ dining area with French doors and extended glass panels overlooking the garden. We designed and installed the kitchen, manufactured and installed the granite worktops. We installed oak flooring throughout and re-wired the entire property. We also installed down lighters and replaced the existing windows.

Client testimonial..."When we first moved into this old house we decided to make some radical structural changes to make best use of the space. This included removing walls and chimneys, as well as installing new roofs, walls, windows, skylights, doorways, and of course steel girders to keep the house up. PSE advised us at each step what was possible and what would work best. It was this careful and patient consultancy that helped us decide to go with PSE over the other quotes we received. Gladly the work was conducted just as PSE said it would be and the house has been transformed. We were happy with their professionalism (dealing with Planning Officers, time-keeping, tidyness, etc) and the quality of the finish. We have used PSE several times since then and would whole-heartedly recommend them to others".



 

Restoration of Church Font

We supplied and installed a concrete base and a bath stone base and then we re -located the font to its new position in the re furbished church



 

House Builder Brief : 2 Double Storey Extensions-On going project

The work is in progress currently. A large, double storey extension. It is completed externally. The plumbing and electrical installations are complete now, and the kitchen design is currently in progress. Insulation, plasterboard installation and plastering are also all in progress.

 

House Builders Brief: A sympathetic reconstruction of a tired period property

The existing lathe and plaster ceiling was taken out exposing original beams. Insulation, board and plaster were put between rafters to form a vaulted ceiling with exposed beams. We installed French doors and balcony to over look the garden and laid a limestone floor We manufactured and installed all of the limestone sills. All this provided the fantastic finish.

 

House Builders brief: House Renovation

Below is a summary of work carried out on for Sarah Beeny as requested. The information details the main objectives entailed, but effectively this is a major house build.

Take out all interior walls
Take out staiircase
Dig out existing ground floor
Take out entire first floor
Supply and install new drainage including manhole, underground pipework, vented soil stack and waste for kitchen appliances.
Supply and install new ground floor slab incorporating hardcore, sand blinding, damp proof membrane, jabblite insulation plus steel reinforcing suspended in slab.
Supply and install steel structure to support new floor.
Reinstate original joists plus new where needed.
Supply and install suspended ceiling.
Supply and install velux windows to side and rear
Take out garage doors.
Build cavity wall to support new window in opening.
Stud and dress exterior with tongue and groove to match new window.

Client testimonial..."We were very happy with not only the price given by Palmer Scott Enterprises but also the speed and standard of the work carried out".


 

House Builders brief: Period Property Arches

Our task in this property was to extend the facade of the house on either side by building archways sympathetic to that of the archway surrounding the front door.

 

House Builders brief: Fantastic Bathroom!

In this property we took out and reinstated an old bathroom, including the ceiling.
We broke into the chimney breast; made structural rearrangments to incorporate a sink and cupboards and fully tiled around. We Installed new plumbing and electrics, including down lights. The plumbing included installation of a bath, shower, sink and toilet.



 

House Builders brief: Loft Refurbishment

Loft refurbishment comprising restructuring of roof, installation of Velux windows, formation of bathroom and installation of plumbing and electrics. Supply and install new staircase.



 

House Builders brief: Garden Wall and Internal Works

Take down & re-build 2m high X 10m long front garden wall, reusing original bricks where possible. (This is an area where space is of limited availability and the public footpath needed to be unobstructed and kept clean). Supply reclaimed materials to suit existing.

Close up en-suite entrance, take out full-length cupboard in bathroom, install door and frame to enable entrance from master bedroom in preference to child’s bedroom. Replace skirting and plaster finish.




 

Kitchen refurbishment and reconstruction

We took out the existing kitchen including the floor and sub floor.We inserted structural steel supports and removed the chimney breast from both ends. We installed a new floor and sub- floor and finished the flooring in natural oak. We then designed and installed a new kitchen to compliment the new large open plan floor space and manufactured and installed the granite work tops. Next we installed French doors and windows and decorated throughout.

Client testimonial "Tony and his team transformed our kitchen from a dark, cluttered room with no access to the garden to a light, airy room we want to be in all the time. Friends have asked if we've had an extension .. in fact, Tony simply removed two large chimneys, put in a large window and doors to the deck, and repositioned a new kitchen. He and his team were friendly, reliable and tidy! And the project was finished on time."


MORE PICTURES >>


 

House Builders brief: Extensive House Reconfiguration & Refurbishment

Demolition of chimney stack in its entirety creating added space to kitchen, bedrooms and loft space.

Demolition of walls and ceilings, structural supports and installations.
All finished and decorated to complement the character of the building.

Design and install kitchen including design
Manufacture and installation of granite worktops
Refurbishment of the original wooden floor as a feature.

Take out old and install new windows throughout
Enlarge kitchen window and add french doors to patio
Design and lay patio area.

Remove, restore and re-instate original features such as doors and light switches.

Design and install bathroom.
Design and re-fit bedrooms.

Convert toilet and coal store into utility room
Design and install shower, toilet and basin incorporating granite work surface .

Convert upstairs cupboard space to incorporate a toilet with hand basin.

Completely render and paint entire exterior of property.
Design and install driveway, including gates and boundary fence.
Landscape gardens front and rear.

Take out old and install new plumbing and heating in its entirety.
Re-wire throughout the house.
Install downlights to all rooms and to patio area
Install security lights to the front and rear of the house and strategically place garden lights.



 

House Builders brief: House Extension and Roof

Having extended the garage and re-pitched the roof to suit we then installed a spiral staircase from the newly formed ground floor extension to the living area created by the new roof structure, incorporating 2 large dormer windows from which access was then provided to a tiled and balustraded roof terrace. We also created a bathroom incorporating stud wall, door and floor and wall tiling and installation of plumbing and electrics. Removal and reinstatement of fence to enable access for materials and machinery during construction.
MORE PICTURES >>